Justice N.J. Jamadar Bombay HC SUPPLY RESTORED Two years without power, onebill cut in half
[ Bombay High Court ]

Two years in the dark, stone crusher gets power on half of a Rs 22.9 lakh theft bill: Bombay HC

Justice N.J. Jamadar held that Sections 126 and 135 of the Electricity Act cannot be kept in watertight compartments when a theft bill is assessed, found a 22-month assessment prima facie arbitrary, and set the deposit at Rs 11,46,705 for restoration of supply.

A stone crusher near Yeola in Nashik district has had no electricity for almost two years. On 3 November 2026 the Bombay High Court told the power distributor to switch it back on within three days of a deposit of Rs 11,46,705, which is half of the Rs 22,93,410 theft bill the company raised.

Justice N.J. Jamadar partly allowed the petition of Sopan Haribhau Athshere against the Maharashtra State Electricity Distribution Company Limited (MSEDCL). The Special Court is still to decide how much the crusher owner actually owes.

What the flying squad found

Mr Athshere runs a stone crusher at Savargaon, Yeola, with two meters supplying the plant. On 18 December 2024 an MSEDCL flying squad inspected it. The report said a fuse before one meter had been removed and the supply diverted to another meter’s incoming terminal, bypassing the metering equipment on consumer number 061548005271.

An assessment report followed on 23 December 2024 under Section 135 of the Electricity Act, 2003. It put the period of theft at 22 months, from February 2023 to November 2024, and the net assessed units at 1,23,855 after deducting 16,978 billed units.

On 27 December 2024 MSEDCL billed Rs 22,93,410 for the theft, plus Rs 7,50,000 as compounding charges. When the money was not paid, supply to both meters was cut. On 7 February 2025 MSEDCL lodged a report for an offence under Section 135.

Two rounds in the district court

Mr Athshere went unsuccessfully to the civil court and the consumer forum. He then filed Civil Miscellaneous Application 05/2025 in the Special Court where the prosecution is pending, asking it to determine his civil liability under Section 154(5) of the Act.

On 8 April 2025 the District Judge appointed the Electrical Inspector, Nashik, to examine the assessment. The inspector reported that the exact period of theft was not established, so it should be taken as six months. That gave 16,591 net units, after deducting 13,552 billed units from 30,413 assessed.

The District Judge refused interim restoration on 11 August 2025. Civil liability could be fixed only after evidence, he said, and restoring supply would amount to granting final relief.

Mr Athshere took that order to the High Court in Writ Petition 12666 of 2025. On 25 November 2025 he was allowed to withdraw it, with liberty to file a fresh application asking the court to fix the amount to be deposited.

In the second round he offered to deposit Rs 3,07,213 on the inspector’s figure. The District Judge again refused, on 29 January 2026, saying no interim relief arose until liability was finally determined. That order was the target of this petition under Article 227.

MSEDCL: an open and shut case

Ms Nikita Jacob appeared for MSEDCL. She argued that this was blatant theft by bypassing the meter, and that the third proviso to Section 135(1A) lets supply return only when the entire assessed amount is paid. Restoring supply on a small part of the bill, she said, would prejudice the licensee and the public interest.

She relied on the Maharashtra Electricity Regulatory Commission’s Supply Code Regulations of 2021 and on a Division Bench ruling in Bhavani Polymers Industries v. MSEDCL. The Electrical Inspector, she added, was not an authorised assessing officer and had himself said so.

Even on the merits, she said, cutting the period to six months ignored material supporting 22 months. Sections 126 and 127 of the Act, which deal with unauthorised use, were distinct from Section 135, which deals with theft.

The petitioner: no waiting for the trial

Mr Sanjay Shinde appeared for Mr Athshere. He said the District Judge was wrong to hold that the Special Court could not determine civil liability at an interim stage. Section 154 power, he argued, is not hemmed in by Sections 126 and 127.

He relied on a Bombay single-judge ruling in Samadhan Arun Doifode v. MSEDCL, which drew a clear line between the two provisions. The inspector’s six-month finding, he said, matched the 2021 Regulations and the Commission’s circulars, and his client was ready to pay on that basis.

Why the two sections converge

Justice Jamadar began with the text. Section 126 deals with unauthorised use of electricity and, with Section 127, forms a complete code: provisional assessment, objections, a final order and an appeal. Section 135 sits in the Act’s offences Part and opens with the word dishonestly, which brings in criminal intent.

The third proviso to Section 135(1A) requires the licensee to restore supply within 48 hours of payment of the assessed amount. Section 154(5) lets the Special Court fix civil liability for theft, at not less than twice the tariff for 12 months or the exact period of theft, whichever is less.

MSEDCL’s reading, that the sections run in separate spheres, looked consistent with the text, he said. But the two provisions, in his words, “cannot be construed in watertight compartments” (para 22).

The reason is simple. Every theft of electricity is also unauthorised use, though not every unauthorised use is theft. At the stage of assessing the money, he held, the two sets of provisions converge.

The Supreme Court line he followed

The judge started with the three-judge ruling in SOUTHCO v. Seetaram Rice Mill, which drew the distinction: Section 126 reaches unauthorised use even without intent, while Section 135 covers dishonest abstraction, such as a direct connection bypassing the meter.

He then traced how later rulings softened the divide. The Supreme Court in West Bengal SEDCL v. Orion Metal held that the assessed amount in the third proviso is the one assessed under Section 126(1), and that theft cases fall within unauthorised use.

The High Court in that case had held that the authorities could assess under Section 126 only where the consumer sought restoration after disconnection. Otherwise, it said, civil liability could be fixed only by the Special Court under Section 154(5). The Supreme Court disagreed and said both processes can run together.

In Himadri Steel v. Jharkhand Urja Vikas Nigam the Supreme Court said Section 135 has no separate assessment procedure. Section 127 applies to theft as much as to Section 126, it said, because theft is a subset of unauthorised use.

The latest was Dakshin Gujarat Vij Company v. Vaibhav Metal Crusher, decided on 26 October 2026, days before this judgment. The Supreme Court held that no other assessing officer or procedure exists for theft, so the deposit for restoration must be assessed by the Section 126 route.

Fifty percent, if the bill looks arbitrary

The same Supreme Court ruling dealt with a plea that restoring supply on half the bill was too lenient. It said a constitutional court cannot be wholly bound by the statute, since electricity is necessary for life and livelihood, but that theft involves criminal intent and calls for a circumspect approach.

Each case, it said, must be taken on its facts, and a High Court may even refuse restoration until the whole provisional amount is paid. But where the provisional assessment is prima facie arbitrary, the High Court may, for recorded reasons, direct payment of not less than 50 percent of the demand.

The Supreme Court chose 50 percent because Section 127(2) lets a consumer appeal against a final assessment only after depositing half of it. Justice Jamadar noted that in theft cases the Section 126 and 127 outcome is final only for restoration.

The Special Court’s Section 154(5) determination of civil liability still follows. Under Section 154(6), any amount deposited above that figure is refunded to the consumer. The Supreme Court rejected the licensee’s argument that an appeal under Section 127 would otherwise make the Special Court’s role pointless.

No objection, no final assessment

Applying this, the judge found nothing to show that the Section 126 and 127 procedure had been followed after the 27 December 2024 bill. Mr Athshere had not been given a chance to object. MSEDCL did not claim a final assessment order had been passed. It simply insisted that the full bill be paid.

The Regulations of 2021 did not help MSEDCL. Clause 10.1.2 provides for assessment at twice the tariff for the actual period of theft, and where the period cannot be ascertained it is presumed to be the 12 months before detection. The clause prescribes no separate machinery for theft.

The inspector’s report and the 22 months

Justice Jamadar accepted that the Electrical Inspector was not an assessing officer under Section 126, so MSEDCL’s objection was not unfounded. But at an interim stage, with no final assessment, a report from a court-appointed commissioner could not be called “bereft of any value”.

The period was the larger problem. MSEDCL billed for 22 months, while the Act and the Regulations both look to the exact period or, failing that, 12 months. With the inspector saying the exact period was not established, the 22-month assessment, the judge said, “may suffer from the vice of arbitrariness” (para 36).

He added that this was prima facie and for the final adjudication of civil liability. The plant had also been disconnected for almost two years, and the final determination could take considerable time.

Order

The writ petition is partly allowed and the District Judge’s order of 29 January 2026 is quashed. MSEDCL’s respondents 1 to 4 must restore supply to both meters, consumer numbers 061548005271 and 061540803624, within three days of Mr Athshere depositing 50 percent of the 27 December 2024 bill, that is Rs 11,46,705, and any reconnection charges.

The deposit is to be made under specific intimation to the Deputy Executive Engineer, Yeola. The court clarified that the Special Court shall not be influenced by any of these observations when it finally decides civil liability under Section 154(5). Rule was made absolute to that extent, with no order as to costs.