Pleaded but never argued: Bombay HC enforces USD 24.75 million London award in LNG ship row
Justice Arif S. Doctor held that an arbitral tribunal cannot be faulted for ignoring a repudiation plea that was never developed or pressed, and that the plea in any case rested on a fact the tribunal had already decided against Western Concessions.
The Bombay High Court has ordered enforcement in India of a London-seated ICC award that carries a termination fee of USD 24.75 million, rejecting the losing party’s claim that the tribunal ignored its case of repudiatory breach.
Justice Arif S. Doctor allowed the petition by Total Energies Gas and Power Limited against Western Concessions Private Limited on 19 November 2026.
The dispute grew out of a floating LNG terminal planned for Jaigarh Port in Maharashtra. Western Concessions did not challenge the award in England and did not pay.
In India its only defence was that the tribunal never decided a pleaded repudiation case, which it said made the award contrary to the public policy of India under Section 48(2)(b) of the Arbitration and Conciliation Act, 1996.
The judge held that repudiation was only vaguely pleaded, was never argued before the tribunal, and in any case rested on the same fact the tribunal had already decided against Western Concessions. The court stayed its order for eight weeks.
A ship that could not enter the port
On 18 October 2017 Total Energies, as service provider, and H-Energy Gateway Private Limited, now Western Concessions, as terminal owner, signed a Binding Agreement for Regasification Services.
Total Energies was to supply a floating storage and regasification unit, the Cape Ann, moored at Jaigarh Port, operated by JSW Jaigarh Port Limited, to receive LNG and deliver gas to the onshore grid. Section 14(a)(vi) of Exhibit A required the vessel to carry the certificates, documents and equipment required by applicable law.
Disputes arose over a Conditions of Use Agreement that JSW wanted signed before the vessel could enter and operate at the port. The agreement was to be concluded between JSW and the vessel owner, with the two parties facilitating.
JSW proposed liability limits of USD 1 billion for oil pollution and USD 350 million for other accidents, while Total Energies said the vessel’s liability should not exceed USD 150 million. Talks ran from late 2018 to April 2020 without agreement.
The vessel arrived outside the port and tendered a Notice of Arrival on 15 March 2020, but without the agreement it could not enter.
Western Concessions argued that the agreement fell within Section 14(a)(vi) and that its absence was a material breach and a repudiatory breach. Total Energies disputed that the agreement was a document required under that clause.
Western Concessions terminated on 9 April 2020, and Total Energies disputed the termination the same day.
Total Energies then asked for proof of terminal owner insurance and, in May 2020, drew down USD 10,445,035.93 from standby letters of credit issued by Western Concessions for unpaid invoices. On 30 June 2020 it terminated the agreement itself and, in November 2021, requested arbitration.
The London award
A three-member tribunal sat under the ICC Rules 2021, with London as the seat and English law governing the contract. A Partial Final Award of 14 April 2023 rejected Western Concessions’ jurisdiction objection.
The Final Award of 23 April 2025 upheld Total Energies’ termination and ordered Western Concessions to pay, within 21 days, a termination fee of USD 24,750,000 and an outstanding invoice balance of USD 67,305.
It also awarded interest of USD 5,172,132.45 up to 6 December 2024 and USD 4,369.59 a day after that, GBP 2,579,409.54 for legal costs and USD 445,000 for the costs of the arbitration. Total Energies sought enforcement under Sections 47 and 49 of the Arbitration Act.
The court recorded that Western Concessions had challenged neither award under the English Arbitration Act. Payment demands of 28 April and 13 May 2025 went unanswered. An English solicitor’s affidavit of 2 October 2025 confirmed that no challenge had been started, and Total Energies said the award became binding on 21 May 2025.
Total Energies’ case for enforcement
Senior Advocate Zubin Behramkamdin said the award arose from a commercial relationship under a written arbitration agreement and was made in the United Kingdom, a reciprocating territory notified in 1976 under the New York Convention.
Total Energies had produced an authenticated award and a certified copy of the agreement, both in English, which met Section 47. None of the grounds in Section 48 applied.
In rejoinder he went further. Western Concessions’ oral submissions before the tribunal, he said, were confined to whether the agreement was a document required under Section 14(a)(vi).
Repudiation was never argued, and a plea pleaded but not argued is deemed abandoned. He cited Daman Singh v. State of Punjab, Common Cause v. Union of India and Vijay Karia v. Prysmian Cavi E Sistemi SRL.
He also argued that the plea was too vague to meet. The earliest pleading used the words “it was also a repudiatory breach”, the statement of defence mentioned it only in two paragraphs, and the closing submissions dropped it entirely.
If it was pleaded, he said, it was subsumed in the finding on Section 14(a)(vi), since the same missing agreement was the factual basis for both.
On the merits of repudiation, he said there was no contractual duty to sign the agreement, the vessel owner’s P&I Club had to approve it, Total Energies was still engaging with the draft two days before termination, and the parties kept negotiating for over a month afterwards.
For the law he relied on Claude-Lila Parulekar v. Sakal Papers and the English Eminence Property Developments v. Heaney on clear renunciation.
He added that Western Concessions had not asked the tribunal for an additional award under Section 57(3)(b) of the English Arbitration Act, nor challenged the award for serious irregularity under Section 68(2)(d), and that Section 73 barred it from raising the point late.
Western Concessions’ case against it
Senior Advocate Aspi Chinoy said the tribunal never decided the repudiatory breach case, which went to the root of the matter.
He traced it through the 14 April 2020 letter, the Answer to the Request for Arbitration, the Terms of Reference (Issues 38.3 to 38.6 and 38.8), the Statement of Defence and Counterclaim and the opening submissions, one of which framed the issue as whether Western Concessions was entitled to terminate for “material or repudiatory breach”.
The tribunal itself recorded the plea at paragraphs 51 and 53 of the award but decided only whether the agreement was required by Indian law, and held that termination under Section 26(a)(vii) was invalid. Chinoy said the award left repudiation, a common law right to terminate, untouched.
He relied on Vijay Karia, Campos Brothers Farms v. Matru Bhumi Supply Chain and I-Pay Clearing Services v. ICICI Bank for the proposition that a complete failure to decide a vital issue offends basic notions of justice.
He conceded that the inference of overlooking an issue must be “clear and virtually inescapable”, and argued that an issue stays in play unless expressly withdrawn, citing Singapore decisions in JVL Agro Industries and BTN v. BTP.
In sur-rejoinder he said an enforcement court exercises independent jurisdiction under Union of India v. Vedanta, so failure to challenge in London did not bar a public policy objection.
He added that Sections 57(3) and 73 did not apply, because repudiation was an issue within a defence and not a separate claim, and Western Concessions could not have known before the award that it would be skipped.
A narrow door under Section 48
Justice Doctor began with the limits of the court’s role.
“It is well settled that the grounds for refusing enforcement of a foreign award, as enumerated in Section 48 of the Arbitration Act, are exhaustive and must be construed narrowly.” (para 63(A))
He said the court cannot review the merits of a foreign award and that a resisting party must meet a very high threshold, relying on Gemini Bay Transcription, Avitel Post Studioz, Vedanta, Shri Lal Mahal v. Progetto Grano, Nagaraj Mylandhu v. PI Opportunities Fund-I and Vijay Karia.
The sole ground of resistance was non-determination of repudiatory breach. The judge framed three questions: whether the tribunal had to decide repudiation at all, whether it was distinct from the Section 14(a)(vi) breach the tribunal did decide, and whether the omission would meet the Section 48(2)(b) threshold.
Was repudiation ever in play?
The judge accepted that the words “repudiatory breach” appeared in the Answer to the Request for Arbitration and the Statement of Defence.
He still held that the tribunal was not required to address the plea, for five reasons: the pleadings had no particulars, the issues framed referred to material breach and not repudiation, the transcripts of closing arguments showed no repudiation case, an additional award was available under Section 57(3)(b), and a challenge under Section 68(2)(d) was the remedy for unaddressed issues.
He also noted that even in the Indian proceedings Western Concessions had not identified any argument on repudiation that was advanced and overlooked. The transcripts, he said, were “copiously silent” on it, and the entire case before the tribunal was one of material breach.
“An Arbitral Tribunal cannot be faulted for not deciding an Issue which was neither adequately pleaded nor pressed.” (para 63(J))
JVL Agro and BTN v. BTP did not help, he said, because those cases involved issues argued at some stage and later said to be abandoned.
Here repudiation was never developed, so there was nothing to withdraw. RAV Bahamas v. Therapy Beach Club and World Trade Corporation v. Czarnikow Sugar asked whether the tribunal’s attention was “sufficiently clearly drawn” to the issue, a test that cut against Western Concessions.
On Vijay Karia, the judge said the inference that a tribunal overlooked an issue must be “clear and virtually inescapable”. The facts were equally consistent with a tribunal treating a narrower question as the operative dispute, which is what the oral arguments of both sides had done.
He held that the principle that a plea not pressed is abandoned, though developed in non-arbitral cases, applies to arbitration, and that Vijay Karia said so.
The same fact, the same answer
The judge also doubted that repudiation was genuinely independent. The early Answer listed several “fundamental repudiatory breaches”, including missing customs clearances and lapsed credit support.
By the Statement of Defence those had gone, and paragraphs 13 and 52 rested repudiation entirely on the failure to conclude the agreement and the vessel’s resulting inability to enter the port.
Reduced to that single factual basis, repudiation was not a distinct case needing separate adjudication, so Torch Offshore v. Cable Shipping did not apply. The tribunal, he said, had gone beyond finding that the agreement was not required by law.
“The Tribunal further found that the COU was a contractual licence granted by JSW, to which the Petitioner was, in substance, a stranger.” (para 63(M))
Western Concessions had accepted that finding and could not reopen it in enforcement proceedings. It was hard to see how it could then claim repudiation of an obligation that, on the tribunal’s findings, Total Energies never owed it.
Silence on a claim can ordinarily be read as its rejection, the judge said, citing Santa Sila Devi v. Dhirendra Nath Sen.
Separate adjudication is needed only where the matter requires it, and here both breaches rested on one fact on which the tribunal made a considered finding. An award, as Vijay Karia says, is read as a whole.
The chronology also sat badly with repudiation. The parties kept negotiating the agreement for more than a month after the conduct said to justify termination, which is hard to reconcile with a clear and unequivocal refusal to be bound, as Claude-Lila Parulekar and Eminence Property Developments require.
Even if the issue was overlooked
Although it was strictly unnecessary, the judge addressed the third question briefly. As a matter of principle, he said, the proposition in Campos Brothers and I-Pay Clearing that a complete failure to decide a material issue renders an award unenforceable may be correct, but those cases were different.
In Campos Brothers the arbitrator, on a wrong factual basis, refused to consider a party’s evidence at all in a proceeding conducted on written submissions.
In I-Pay, a domestic award under Section 34 granted a large sum without any finding on whether termination was lawful. Here the tribunal heard full oral argument, and the issue said to be missed was in substance answered by its finding.
Order
The court held that Western Concessions had failed to establish that the Final Award is contrary to the public policy of India under Section 48(2)(b).
The petition was allowed in terms of prayer clause (a) of Commercial Arbitration Petition No. 1110 of 2025, and Interim Application No. 8094 of 2025 was disposed of as not surviving. There was no order as to costs.
After pronouncement, Senior Advocate Zarir Bharucha asked for an eight-week stay. Behramkamdin agreed on the condition that the statement recorded in the court’s order of 4 May 2026 continue. The statement was accepted, and the order is stayed for eight weeks from 19 November 2026. Judgment was reserved on 10 September 2026.