Supreme Court: Bombay High Court could not order quick action on a disputed fire-refuge terrace
Three Supreme Court judges set aside an order to enforce a civic notice against a Powai flat owner, kept the terrace-door direction and gave the civil court six months.
The Supreme Court on 25 November set aside a Bombay High Court direction that the Mumbai civic body must at once enforce its order against a flat owner in a Powai high-rise. The dispute is over a terrace that the building society calls a fire refuge and the flat owner says was sold to him.
A bench of Justice Vikram Nath, Justice Sandeep Mehta and Justice Aparesh Kumar Singh held that the High Court had settled seriously disputed facts in a writ petition. Justice Mehta wrote the judgment.
A terrace claimed as a refuge area
The building is Evita, a 29-storey residential tower in the Hiranandani Gardens township at Powai, Mumbai. Its planned height was 95.35 metres. The developer is HGP Community Pvt. Ltd., formerly Lakeview Developers.
Mumbai Fire Brigade issued no-objection certificates on 24 October 2002 and 26 March 2004. Condition 14 of the 2004 certificate dealt with refuge areas in two parts.
Clause 14(A) fixed a refuge area of 112.84 square metres on the 8th, 14th, 20th and 26th floors. Clause 14(B) said the terrace floor would also be treated as a refuge area, subject to signage, drinking water and emergency lighting.
Ajit Patel bought Flat Nos. 2902/A to 2902/D, together 4,575 square feet, under four separate registered agreements dated 31 August 2007. They specified a total consideration of Rs 3,02,33,125 including additional amenities such as the terrace areas matching each flat.
Two versions of the same roof
Patel said the flats and terraces were allotted to him as one arrangement. He relied on the later fire NOC and sanctioned plans to argue that the disputed portion was not kept as a refuge area in the final approved configuration.
The building was completed in 2006. After an inspection, the fire department conveyed its no objection to occupation, and the Brihanmumbai Mahanagarpalika (MCGM) issued the Occupation Certificate on 15 June 2007.
According to Patel, the approved plan showed two sections of terrace, one above Flat 2901 and one above Flat 2902. He claimed the part above Flat 2902 as his own, and said the rest was open to the sky and meant for common use.
The respondents disputed all of this. They said the entire terrace of the building formed part of the refuge area under the original NOC and sanctioned plan.
From a complaint to the High Court
Evita Co-operative Housing Society Ltd. was registered in November 2008. On 28 October 2016 it complained to the fire brigade that Patel had encroached on the refuge terrace and had made impermissible changes to his flats.
An inspection followed, and a report of 8 March 2017 recorded that the terrace was divided in two. It also noted that the office copy of the occupation NOC could not yet be found.
The Society and its Secretary then filed Writ Petition No. 254 of 2021 in the Bombay High Court. They objected to the developer conveying the terrace to Patel at all, saying it was earmarked as a common fire refuge. The petition remained pending for almost five years.
On 6 March 2025 the MCGM issued Patel a notice under Section 53(1) read with Section 52(1)(b) and (d) of the Maharashtra Regional and Town Planning Act, 1966. It alleged unauthorised work in Flat 2902 and on the terrace.
The list ran to a covered duct, a spiral staircase, wooden platforms and decks, and wooden and glass sliding doors. Patel said these works predated the Occupation Certificate and that, as a bona fide purchaser, he was not answerable for them.
On 10 August 2025 the MCGM passed an order asking him to remove the works within 15 days. Patel challenged the notice and order in L.C. Suit No. 102020 of 2025 before the Bombay City Civil Court, where the suit is pending. He did not get an injunction.
What the High Court ordered
A Division Bench decided the writ petition on 5 August 2026 and made it absolute. It noted that arbitration was under way between the developer and Patel and said it was not deciding what either was entitled to.
It pointed to photographs showing that entry to the terrace was blocked and that the only access was an internal staircase through Flat 2902/A. Because no stay had been granted, it directed the MCGM to implement the 10 August 2025 order immediately.
The High Court added that the MCGM could report non-compliant refuge areas on other floors to the fire department, which could even withdraw the Occupation Certificate. If Patel closed the terrace access, the staircase inside his flat could stay. The common door to the terrace had to be opened.
Why the Supreme Court stepped in
Patel appealed by special leave. The Supreme Court gave leave and heard counsel for both sides. The judgment does not name them or set out their arguments in detail.
The bench found that the High Court had gone into seriously disputed questions of fact. Whether the terrace formed part of the refuge area needed evidence to be sifted and contemporaneous documents examined. That is the very question before the civil court.
It said the High Court’s observations had the tenor of conjecture and surmise drawn from photographs placed during the hearing. It held:
“the High Court erred in exercising the extraordinary jurisdiction under Article 226 of the Constitution of India in the petition preferred by the respondents to adjudicate a lis which involves seriously disputed questions of fact.” (para 23)
The bench added that a court hearing a writ under Article 226 need not take up a challenge turning on disputed facts. Such issues are better left to the civil court or the statutory authority, it said.
A direction that would empty the suit
The bench then looked at the enforcement direction. The High Court had said it was not deciding either side’s entitlement, yet it told the MCGM to implement the order at once.
Patel had already gone to the civil court against that very order. The bench said an immediate-implementation direction made his remedy redundant, and that the High Court had relied on the absence of an injunction, which put the onus on the MCGM to act. It continued:
“the remedy before the Civil Court would be overshadowed, leaving hardly any scope for the Civil Court to take an independent view on the legality and validity of the order dated 10th August, 2025.” (para 28)
The directions also overlapped completely with the issues in the pending suit, so they prejudiced it.
One direction survived. The bench held that opening the common door was justified, because it would give all occupants clear access to the terrace in an emergency. That part stays, without prejudice to the discretion of the civil court.
Order
The Supreme Court allowed the appeal and set aside the High Court judgment, except for the direction that the common door be opened for access to the terrace.
Patel may raise all his defences in the pending suit, and the Society may contest it if it wishes. The bench directed the civil court to expedite the suit and to try to conclude it, preferably within six months of receiving a copy of the order.
The civil court must decide the suit uninfluenced by the High Court’s observations, and the parties must cooperate. Pending applications stand disposed of.