NCLAT COMPANY APPEAL INSOLVENCY NCLAT A guarantee signed around the regulatorreaches only the separate business
[ NCLAT ]

NCLAT limits lenders to India Power Corporation separate business, hands core back in 30 days

The Chennai bench kept the insolvency admission against the electricity licensee alive, but held that its 2016 guarantee for Meenakshi Energy sidestepped the regulator and cannot reach distribution assets or tariff income.

The National Company Law Appellate Tribunal at Chennai has cut down a bank's insolvency claim against an electricity distribution licensee. India Power Corporation Limited stays in the corporate insolvency resolution process, but only its separate business, and the income from it, can answer for a 2016 corporate guarantee it gave for a power-plant company's loans.

The bench of Justice N. Seshasayee, Member (Judicial), and Jatindranath Swain, Member (Technical), ruled on 27 November 2026. It ordered the resolution professional to hand the licensed distribution business back to the old management immediately after 30 days.

A century-old licensee takes over a power plant

India Power Corporation Limited, referred to in the order as IPCL, has distributed electricity in West Bengal since the 1920s. It works under the Electricity Act, 2003 and the licensing regulations framed by the West Bengal Electricity Regulatory Commission, or WBERC.

Meenakshi Energy, the principal borrower, was promoted by Engie Global Developments B.V., a Dutch subsidiary of a French company, to run thermal power projects in two phases. Phase I, a 270 MW project, was financed under a loan agreement of 10 July 2009 with a consortium led by State Bank of India.

Phase II, a 700 MW project, was financed on 1 October 2010 by a consortium led by Rural Electrification Corporation.

On 25 February 2016, IPCL agreed to buy the 95.07 per cent stake in Meenakshi Energy and to infuse about USD 300 million. SBI approved the share transfer on 18 May 2016, with a rider that IPCL must guarantee the outstanding loans.

Legal opinions and a deed signed without consent

IPCL objected on 29 July 2016. Regulation 5.13.2 of the WBERC regulations, it said, barred it from giving such a guarantee. The lenders answered with three legal opinions, dated between 8 and 19 September 2016, saying the bar covered only its regulated assets and surplus funds.

On 23 September 2016, IPCL pledged its entire shareholding in Meenakshi Energy and signed a deed of corporate guarantee in favour of SBICAP Trustee Company Limited. The deed limited recourse to "Non-Regulated Assets" and "Surplus Amounts". A director also swore an affidavit that no prior WBERC consent was needed, and none was sought.

Three trips to the regulator, two civil suits

IPCL went to WBERC on 17 August 2017 for approval to issue guarantees to lenders. The Commission refused on 9 November 2017, saying enforcement could hurt consumers in the licensed area. The order records that IPCL did not tell it about the deed it had already signed.

A second application, filed on 15 May 2018, was refused on 7 August 2018. It too left out the deed. On 26 October 2021 IPCL filed a third application under Regulation 5.15.1.

On 22 December 2021 WBERC determined that prior consent under Regulation 5.13.2 was mandatory, and issued a show-cause notice under Section 142 of the Electricity Act.

IPCL also sued. Its Commercial O.S. 266 of 2017 in Hyderabad, seeking a declaration that the guarantee was void, was withdrawn on 2 April 2019 without liberty to file afresh. Money Suit 1 of 2022 in Alipore is still pending.

An ex parte injunction there was vacated, and the Calcutta High Court confirmed that on 16 May 2023 in F.M.A. No. 1370 of 2022.

From default to a Section 7 petition

Meenakshi Energy's loan account turned into a non-performing asset on 28 October 2017. On 20 December 2017 the security trustee issued a first demand certificate for about ₹93.57 crore and invoked the pledge, and the pledged shares passed to it on 2 May 2018.

A second demand certificate of 7 February 2020 claimed about ₹967.21 crore. SBI filed its Section 7 petition against IPCL on 26 February 2020. Meenakshi Energy itself had gone into insolvency on 7 November 2019, and its resolution plan was approved on 10 August 2023.

Two rounds before the NCLT

This is the second time the matter has been before the tribunal. SBI had filed its rejoinder late, and after the NCLT and the NCLAT dealt with that dispute, SBI took it to the Supreme Court in Civil Appeal No. 8178 of 2023.

Meanwhile, the NCLT dismissed SBI's petition on 30 October 2023, holding the guarantee void under Section 23 of the Contract Act. The Supreme Court's judgment of 14 February 2025 sent the Section 7 application back for fresh decision on its merits.

After hearing it afresh, the NCLT Hyderabad Bench admitted SBI's petition on 15 May 2026. It held that IPCL had signed the guarantee consciously as part of a commercial arrangement.

It added that missing WBERC approval did not by itself make the deed void, that IPCL was estopped by its earlier conduct, and that the petition was within limitation from the demand of 20 December 2017.

What the appellants and the bank argued

The appeals were filed by two suspended directors, Debashis Bose and Pragya Jhunjhunwala. Advocate General Vijay Narayan appeared in the first, Company Appeal (AT) (CH) (Ins) No. 262 of 2026, and Senior Advocate Krishnendu Datta in the second, No. 263 of 2026. Solicitor General Tushar Mehta and Senior Advocate P. H. Arvindh Pandian appeared for SBI.

The appellants said the guarantee was void under Section 23 of the Contract Act for want of the prior written consent that Regulation 5.13.2 demands. Without a valid guarantee, they said, there was no financial debt.

They argued that WBERC's orders had become final, that the director's affidavit could not validate a prohibited contract, and that a penalty-backed requirement operates as a prohibition under Asha John Divianathan v. Vikram Malhotra and Mannalal Khetan v. Kedar Nath Khetan.

In the alternative, they pointed to Clause 2.7 of the deed, which confines IPCL to non-regulated assets. They said any ambiguity should count against the lenders who drafted it.

Those assets, they added, had been moved to a wholly owned subsidiary, IPCL Power Limited, on 2 June 2025, and the Insolvency and Bankruptcy Code has no process confined to specified assets.

SBI said IPCL had signed voluntarily and had represented that all approvals were in place. The Regulation, it argued, does not declare such a guarantee void, and the penalty for breach is regulatory action.

SBI relied on Section 238 of the Code, decisions on power companies in insolvency, including the admission of Hiranmaye Energy, and Clause 2.4 of the deed, which it said preserved IPCL's indemnity even if the guarantee failed.

SBI also argued that only a civil court can declare a contract void, that the guarantee was not truly limited, and that moving the non-regulated assets was meant to defeat the lenders.

Neither side can plead innocence

The bench described the central issue as whether the deed of 23 September 2016 is valid enough to show a financial debt under Section 7. It noted its own earlier view in Umesh Kumar v. Narendra Kumar Sharma that it cannot go into the validity of a contractual agreement.

This case differed, it said, because the defence rested on a statutory regulation and an alleged unlawful object.

The bench then set the width of its enquiry. In a summary Section 7 proceeding, it said, the question is whether the defence is genuine, judged on the rule of preponderating probability. It did not intend "to travel the entire distance to match the jurisdiction of a civil court".

It then turned on both parties. The legal opinions earned no credence, since IPCL was keen to buy Meenakshi Energy and "is no child to complain that it was induced".

SBI knew before the deed was signed that WBERC's prior consent was needed, and it had three options: drop the condition, refuse approval for the takeover, or wait for the Commission. It took none.

In the bench's words, both parties got into a contract "through a consciously contrived drafting" to hoodwink the Electricity Act, its regulations and the regulator. It also gave no weight to the director's 2016 affidavit, since a person governed by a statutory regulation cannot stand against it.

The argument that the NCLT exceeded the Supreme Court's remand also failed, because the remand order itself sent the whole Section 7 application back.

How the deed reached the core business

The bench read the deed's own definitions. "Regulated Asset" meant only the revenues and receivables of the Dishergarh Electric Licence. "Non-Regulated Asset" meant everything else.

The effect, the order says, is that the fixed and tangible assets needed to run the distribution licence fell on the non-regulated side, and the definition did not even exclude the licence itself.

"Surplus Amounts" were the balance of licence revenue after certain costs. A distribution licensee does not control that balance freely, since tariff fixation counts it. So the second limb of the guarantee also reached money that the regulator treats as its own concern.

On its face, Clause 2.7 reads as a limited guarantee. The bench said the reading changes once the definitions are applied.

“By limiting the liability exposure to Non-Regulated assets and Surplus Amount in Clause 2.7, the deed of guarantee gives an impression that the guarantee provided by IPCL is a limited guarantee, but as would be seen later, it is merely a phrasal camouflage that conceals its actual intent and extent.”

— Para 9

Why a licensee cannot freely pledge

The bench traced the statutory scheme. Section 51 of the Electricity Act lets a distribution licensee run other businesses on prior intimation, but its second proviso says the distribution business must not subsidise them or encumber its distribution assets to support them.

Regulation 5.13.2 requires the Commission's prior written consent for a guarantee beyond the normal area of core activities.

The regulations define core, non-core, other and separate businesses. Section 17(3) bars a licensee from transferring its utility without approval, with Section 17(4) declaring violations void, and on revocation of a licence Section 20 lets the government acquire the utility.

The bench saw in this a legislative anxiety to protect distribution to consumers, adding that a licensee neither controls its profits absolutely nor its utility once it starts the business.

The Regulation, it held, does not bar a guarantee. It insists on prior permission, aimed at balancing public interest with the licensee's commercial need to encumber assets.

“It is hence Regulation 5.13.2 does not bar providing guarantee, but only insists that prior permission of the Commission be obtained before it is so given.”

— Para 18

Section 238 and the Contract Act

SBI had leaned on Section 238 of the Code, which overrides inconsistent laws. The bench cited Macquarie Bank v. Shilpi Cable Technologies for the point that the clause works only where there is an inconsistency.

The Electricity Act and the Code operate in different spheres, it said, and forming a contract in line with a special statute is not inconsistent with the Code.

On the facts, the parties had contrived a strategy to bypass the Regulation, which "appears to be more than a strong probability" of fraud on the statute.

“It is not avoidance of a statutory procedure but evading it by subterfuge.”

— Para 21

On Sections 23 and 24 of the Contract Act, the bench noted that Section 142 of the Electricity Act carries a penalty of up to ₹1 lakh per contravention and ₹6,000 a day for a continuing one.

It quoted the Supreme Court in Asha John Divianathan: a contract prohibited by a statute under a penalty is void even without a declaration, and a requirement of previous permission can amount to prohibition.

The bench did not declare the guarantee void. It said it need not delve into the limits of its own authority, but asked whether it could "blindfold ourselves" to the law the Supreme Court declared.

It held that there was "more than a strong prima facie case", and that it would not be safe to treat the deed as creating a legal relationship with SBI for the purposes of Section 7, insofar as the licensed business was concerned.

The regulator's third order set aside

The appellants had also said the NCLAT could not sit over WBERC's order of 22 December 2021. The bench disagreed. That order had focused on the need for prior permission without examining the deed's own limiting terms, and without explaining how separate business falls under the Commission.

Regulation 5.15.1 lets the Commission decide disputes about the interpretation of the licence. There was no such dispute, the bench said, and the Commission has no power to interpret any document other than a licence.

Its remarks on the validity of the deed were "without jurisdiction", and could not affect the separate business or income from other and separate businesses.

Because of this, questions such as whether a civil suit was needed or how far Section 238 would apply were academic. The bench also set aside SBI's reliance on the 2016 indemnity deed.

That deed was signed in favour of Rural Electrification Corporation, not SBI, and the bench left open whether an unqualified indemnity could touch the core business.

What the bank can still reach

"All is not lost entirely for SBI yet", the bench said. It still has IPCL's separate business, which is outside the regulators' reach under the Electricity Act.

IPCL itself listed those assets as moved to IPCL Power Limited, formerly Parmeshi Energy Limited: a 25 MW wind plant in Gujarat, a smart metering project in Madhya Pradesh, a 133 MW solar project in Maharashtra, a 150 kW distributed solar project for large consumers, and a 50 per cent stake in a joint venture with Uniper SE.

The bench held the deed partly valid. Since Meenakshi Energy's default was not disputed, IPCL could not escape its obligation as guarantor, but that obligation reached only the separate business and the surplus from other and separate businesses.

Limitation did not help the directors

SBI's papers gave different dates of default: 31 January 2020 in Part IV of the application, 28 December 2017 in the list of dates, and the seventh day after the notice of 7 February 2020 in the rejoinder. The NCLT counted from the unmet demand of 20 December 2017.

The bench said the petition of 26 February 2020 was in time on any of those dates. A director who knows the loan transaction cannot use the omission of an exact date as a limitation bar, and it cited Manmohan Singh Jain v. State Bank of India.

Order

The NCLAT held that the NCLT's order admitting IPCL into insolvency needs no interference. It then issued these directions:

The deed of 23 September 2016 is enforceable only as it relates to the separate business of IPCL, which alone, with its income, answers for the guarantee. For surplus income from core, non-core and other businesses, the resolution professional must approach WBERC, which retains control of those profits.

The resolution professional must take charge of the separate-business assets and their income held by IPCL Power Limited, if she has not already done so. If she has material showing that any separate-business asset was not transferred, she may apply to the NCLT, which must hear IPCL before it decides.

She must hand over the core, non-core and other businesses, as defined in the WBERC regulations, to the erstwhile management immediately after 30 days from 27 November 2026, preserving the status quo until then and keeping IPCL a going concern. Anything done to affect the assets of those businesses under the NCLT's order stands set aside.

The appeals are disposed of with no costs.