NGT SUO MOTU COGNIZANCE NGT NGT Fresh wetlands report due before26 February 2027
[ NGT ]

NGT seeks present area of 27 newly listed Jammu and Kashmir wetlands; district data missing for 16

A pollution committee report gave only the revenue area of 27 newly identified wetlands, with Jammu and Kupwara replies still awaited. Water samples from Jammu and Kupwara mostly failed the bathing-water standard. The Tribunal wants the area as it stands today, set beside the revenue figure, in a fresh report before 26 February 2027.

The Jammu and Kashmir Pollution Control Committee told the National Green Tribunal that it has traced 27 more wetlands of over one hectare outside forest land. For each it gave the revenue area, the area recorded on paper. It did not say how much of each wetland remains.

On 6 November, the Principal Bench in New Delhi ordered that gap closed. The Committee must collect the existing area and file a fresh report before the next hearing on 26 February 2027.

Two news items, one bench

Original Application No. 239 of 2024 began on a Kashmir Life article of 2 February 2024 headed "What Challenge are Kashmiri Wetlands Facing?". The Tribunal took it up on its own, with the Jammu and Kashmir Pollution Control Committee as first respondent.

It is heard with Original Application No. 237 of 2026, which began on a report in The Hindu of 7 April 2026 saying 518 of 697 lakes in the region had vanished or shrunk. The order of 6 November does not discuss that second application separately.

The bench of Justice Prakash Shrivastava, Chairperson, Dr. A. Senthil Vel, Expert Member, and Dr. Afroz Ahmad, Expert Member, noted that it was considering the protection of wetlands in Kashmir. Gautam Singh appeared for the Union Territory, and Dr. Gopinath, the Committee's Member Secretary, joined by video link.

Sixteen of 27 wetlands without district data

Acting on an earlier order, the Committee filed its report on 1 October 2026. It obtained the list of 27 newly identified wetlands from the Director, Ecology, Environment and Remote Sensing. It then asked the Deputy Commissioners for the revenue area, the sources of pollution and the extent of encroachment.

Only three districts had answered. Baramulla, Kathua and Samba between them covered 11 of the 27 wetlands. Jammu, with 10 wetlands, and Kupwara, with six, were still awaited, though the Committee's table lists letters to each from 30 May to 9 September 2026.

The Tribunal called the disclosure incomplete. The Member Secretary told the bench a fresh updated report would be filed once the Jammu and Kupwara Deputy Commissioners replied.

What Baramulla, Kathua and Samba reported

The Baramulla Deputy Commissioner reported that the wetland Rakh-i-Daslipora does not exist on the spot. The land is proprietary, and is used for paddy cultivation.

Kathua reported no pollution source and no encroachment at the Janglote wetland. Samba reported no encroachment at any of its nine wetlands, and domestic effluent as the only pollution source, at Mawa Sar.

Water tests: Jammu fails all three

The Committee's regional directors also tested the water against the Class B primary criteria for organised outdoor bathing. In Jammu, 12 samples were collected from 13 identified locations, because one Samba site was inaccessible. All three Jammu samples failed, and the Kathua sample passed.

For Samba, the report's text speaks of nine samples and its table of eight. Both say only two met the criteria. In Kashmir, four of six Kupwara wetlands failed, mainly on biochemical oxygen demand, and Rakhi Duslipora in Baramulla failed on that and on dissolved oxygen.

On 7 August 2026 the Committee asked its regional directors to name the person, agency or department responsible for each violation, so that corrective and punitive action could follow. It sent reminders on 9 September. The report records no reply.

How much of each wetland survives

The bench observed that the report gave each wetland's revenue area but not its existing area. It directed that the Committee obtain the existing area and give the:

"comparative position of the revenue area and the existing area of the wetland" (para 4)

The order contains no finding on encroachment, shrinkage or responsibility at any wetland. It rests on the Committee's reports and the Deputy Commissioners' replies as filed.

Order

The Committee is to file a fresh report, taking account of the Tribunal's observations, at least one day before the next date of hearing. Original Application No. 239 of 2024, with the connected Original Application No. 237 of 2026, was listed on 26 February 2027.